0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Prediction of maximum surface settlement caused by earth pressure balance (EPB) shield tunneling with ANN methods

This publication has been cited in the following 54 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10537324
  • Published on:
    01/01/2021
  • Last updated on:
    19/02/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine