0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Predicting the Impact of Country-Related Risks on Cost Overrun for Overseas Infrastructure Projects

This publication has been cited in the following 5 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10526347
  • Published on:
    11/12/2020
  • Last updated on:
    19/02/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine