0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Predicting Productivity Loss Caused By Change Orders Using the Evolutionary Fuzzy Support Vector Machine Inference Model

This publication has been cited in the following 15 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10354469
  • Published on:
    13/08/2019
  • Last updated on:
    13/08/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine