0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Predicting likelihood of cost overrun in educational projects

Author(s):


Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 1, v. 24
Page(s): 21-39
DOI: 10.1108/ecam-06-2015-0103
Abstract:

Purpose

Being able to predict the likelihood of a project to overrun its cost before the contract signing phase is crucial in developing the required mitigating measures to avert it. Known parameters that permit the timely prediction of cost overrun provide the basis for such predictions. Therefore, the purpose of this paper is to develop a model for forecasting cost overruns.

Design/methodology/approach

Ten predictive variables known before the contract signing phase of a project are identified. Based on a survey approach, information on 321 educational projects completed are compiled. A multiple linear regression analysis is adopted for the model development.

Findings

Five variables – initial contract sum, gross floor area, number of storeys, source of funds and contractors’ financial classification are observed to influence cost overruns. The model, however, yields a fairly weak coefficient of determination with a mean absolute percentage error of 30.22 and 138 per cent, respectively.

Research limitations/implications

The model developed focussed on data only educational projects sampled from three out of the ten administration regions in Ghana based on a purposive sampling approach.

Practical implications

Policy makers and construction managers working on public projects stand to gain tremendous assistance in formulating and strengthening their own in-house cost forecasting at the precontract phase based on “what if” analysis to generate various alternative predictions of cost overruns.

Originality/value

Considering the innate nature of cost overruns within the Ghanaian construction industry often resulting to project abandonment, this research presents a unique dimension for tackling cost overruns based on a predictive approach.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ecam-06-2015-0103.
  • About this
    data sheet
  • Reference-ID
    10576551
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine