0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Predicting Cost and Schedule Performance of Green Building Projects Based on Preproject Planning Efforts Using Multiple Linear Regression Analysis

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/jaeied.aeeng-1424.
  • About this
    data sheet
  • Reference-ID
    10733947
  • Published on:
    02/09/2023
  • Last updated on:
    02/09/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine