Precise Control Survey for Erecting the Steel Pylons of the Third Nanjing Yangtze River Bridge, China: Case Study
Author(s): |
Teng Huang
Guihua Li Hongyu Chen Minwei Jiang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Surveying Engineering (ASCE), February 2010, n. 1, v. 136 |
Page(s): | 29-35 |
DOI: | 10.1061/(asce)su.1943-5428.0000012 |
Structures and Projects
Structure Types
- About this
data sheet - Reference-ID
10399077 - Published on:
06/12/2019 - Last updated on:
06/12/2019