0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Precast Prestressed Segmental Floating Drawspan for Admiral Clarey Bridge

Author(s):

Medium: journal article
Language(s): English
Published in: PCI Journal, , n. 4, v. 43
Page(s): 60-79
DOI: 10.15554/pcij.07011998.60.79

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.15554/pcij.07011998.60.79.
  • About this
    data sheet
  • Reference-ID
    10139666
  • Published on:
    03/12/2018
  • Last updated on:
    03/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine