PPP Renegotiation Framework based on Equivalent NPV Constraint in the Case of BOT Project: Incheon Airport Highway, South Korea
Author(s): |
Deog Sang Bae
Ivan Damnjanoic Dong Hun Kang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | KSCE Journal of Civil Engineering, March 2019, n. 4, v. 23 |
Page(s): | 1473-1483 |
DOI: | 10.1007/s12205-019-1444-9 |
- About this
data sheet - Reference-ID
10291962 - Published on:
29/06/2019 - Last updated on:
29/06/2019