Post simulation visualization model for effective scheduling of modular building construction
Author(s): |
Mansooreh Moghadam
Mohamed Al-Hussein Saad Al-Jibouri Avi Telyas |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Canadian Journal of Civil Engineering / Revue canadienne de génie civil, September 2012, n. 9, v. 39 |
Page(s): | 1053-1061 |
DOI: | 10.1139/l2012-077 |
- About this
data sheet - Reference-ID
10126714 - Published on:
03/12/2018 - Last updated on:
03/12/2018