0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Possibilities of Implementing the Resolution No 92/57 es of the council of the eu ministries in germany

Author(s):
Medium: journal article
Language(s): Latvian
Published in: Journal of Civil Engineering and Management, , n. 4, v. 7
Page(s): 286-293
DOI: 10.3846/13921525.2001.10531738
Abstract:

Until now, in Germany, a construction company was in full responsibility for the fulfilment of a contract including the works performed on the contract terms. Today a person who awards a contractis is also responsible for the works performed on the contract terms. The performance of works in accordance with new terms requires additional experts who work for certain remuneration and to certain extent become the coordinators of construction. The new procedure pursues four purposes: decrease in the number of accidents, the preparation of safety of works, the integration of aspects of a contract into planning and announcing of these aspects before awarding a contract to an executor, and the engagement of the owner of construction in the procedure of settling the problems of work safety. In the course of creation this new system, the following works must be carried out: the elaborated analysis of an available situation and the settlement of a number of theoretical and practical problems. The research performed has shown that the major reasons of accidents in the course of construction comprise falling down from a big height and other events of falling down. They make up almost 40 per cent of all accidents. Over one third of these accidents occur because of the mistakes made at the stage of construction planning. Due to a new attitude to the safety of works the functions of the owner of construction are extended, the plan ensuring the safety of works and health made by a coordinator becomes necessary, mutual cooperation between the owner of construction and a coordinator as well as the qualification of the coordinator become very important. Therefore the functions of a coordinator and decisions that are to be made at the stages of planning, organizing and performing the works must be clearly outlined. To ensure the effective work of a coordinator his remuneration must be correctly calculated in accordance with the EU directives. To ensure the feasibility of this system the responsibility of all its participants must be outlined as well.

Copyright: © 2001 The Author(s). Published by VGTU Press.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10363659
  • Published on:
    12/08/2019
  • Last updated on:
    02/06/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine