0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Planung und Bau von Liegestellen am Ober- und Mittelrhein - Verbesserung der Infrastruktur für den ruhenden Schiffsverkehr

Author(s):


Medium: journal article
Language(s): German
Published in: Bautechnik, , n. 5, v. 91
Page(s): 333-338
DOI: 10.1002/bate.201400027
Abstract:

Planning and construction of berths at the Upper and Middle Rhine. Infrastructure's improvement for stationary ship traffic

The Rhine represents Germany's most important inland waterway by far. In order to ensure a safe and smooth ship traffic it is essential to create suitable basic conditions for the stationary ship traffic as well as for the active ship traffic. Insufficient berths are available nowadays, due to Rhine shipping's evolution in fleet structure. Furthermore there is a lack of former berths. The Federal Water and Shipping Administration is planning new constructions as well as the reconstruction of further and existing berths. Thus, 14 berths emerge at the Upper and Middle Rhine. Each one has a capacity for 2 until 12 ships and is located on a route of 290 km between Iffezheim and Brohl. Initial improvement was already achieved by the construction of berths in Iffezheim, Sondernheim and Koblenz-Wallersheim. Further 11 construction projects will follow within the next years.

Keywords:
footbridge Rhine berth stationary ship traffic mooring dolphin
Available from: Refer to publisher

Structure Types

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/bate.201400027.
  • About this
    data sheet
  • Reference-ID
    10070031
  • Published on:
    20/05/2014
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine