Planning of tunnel excavation for the Vienna underground - construction Lot U1/9 / Planung der Tunnelvortriebe für die Wiener U-Bahn - Bauabschnitt U1/9
Author(s): |
Georg Atzl
Gerhard Ullmann Martin Schmidt |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2015, n. 1, v. 8 |
Page(s): | 74-82 |
DOI: | 10.1002/geot.201400068 |
Abstract: |
The extension of underground line U1 from Reumannplatz station to Oberlaa station, which includes construction lot U1/9, significantly enhances accessibility for local residents and workplaces, achieves optimal regional accessibility and improves connections to regional buses, a park & ride facility as well as easing the pressure on the Reumannplatz station. Starting from Reumannplatz, the U1 will increase by 4.6 km with five new stations in the forthcoming years. By 2017, it will be the longest underground line in Vienna (19.2 km). |
Keywords: |
station tunnel platform tunnel pipe roof umbrella pore pressure relief Rohrschirm
|
Available from: | Refer to publisher |
Structures and Projects
- About this
data sheet - Reference-ID
10071356 - Published on:
19/02/2015 - Last updated on:
24/04/2015