Pier Stabilization Eliminates Need to Reconstruct Damaged Bridge

Author(s):
Medium: journal article
Language(s): English
Published in: Civil Engineering Magazine, , n. 8, v. 53
Page(s): 58-59
Abstract:

After an ice jam near a six-span bridge restricted normal water passage, the ensueing high velocity water caused underscouring of one of the piers, leaving it ineffective as a bridge support. Timber cribbing was installed as temporary shoring to support the two adjacent spans of the bridge, which allowed light maintenance vehicles to pass. After structural investigations were conducted, stabilizing the pier foundation was recommended instead of replacing the pier or modifying the two effected bridge spans. The effected pier was stabilized through innovative underwater work and new bearing pedestals were constructed on top of the pier to support the superstructure. The approach required less time than replacement and saved the client $50,000.

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10015631
  • Published on:
    25/07/2004
  • Last updated on:
    14/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine