Abstract:

This study simulate the evacuation from structural steel manufacturing building and verified with Thai’s regulation. According to the regulation, all occupants shall be in safe place within 5 minutes in case of fire incident. Two simulation scenarios were selected for this simulation. First, all exits can be used for evacuation; evacuation time is 4.23 minute after announcement. Second, fire caused by explosion of compressed air tank near Exit A, which completely block this exit A. Simulation result shown that evacuation time for this particular case is 7.06 minute, which is exceed maximum evacuation time defined in the regulation. Therefore, the following countermeasures are propose: Expand existing stair from 1.0 m to 1.5 m., Install an additional stair with the same width on the opposite side and modify firefighting procedure.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1088/1757-899x/715/1/012072.
  • About this
    data sheet
  • Reference-ID
    10675339
  • Published on:
    12/06/2022
  • Last updated on:
    12/06/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine