PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구 (A Case Study on the Quality Management of Construction Site through PDCA Cycle)
Author(s): |
In-Whee Baik
|
---|---|
Medium: | journal article |
Language(s): | Korean |
Published in: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), February 2008, n. 1, v. 8 |
Page(s): | 49-56 |
DOI: | 10.5345/jkic.2008.8.1.049 |
- About this
data sheet - Reference-ID
10762153 - Published on:
15/03/2024 - Last updated on:
15/03/2024