0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

主筋後挿入方式の架構式PCa工法の開発 (Development of Main Bar Post Insertion System For Precast Concrete Structures)

Author(s):



Medium: journal article
Language(s): Japanese
Published in: Concrete Journal (JCI), , n. 12, v. 33
Page(s): 43-50
DOI: 10.3151/coj1975.33.12_43
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3151/coj1975.33.12_43.
  • About this
    data sheet
  • Reference-ID
    10441155
  • Published on:
    08/10/2020
  • Last updated on:
    08/10/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine