0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Pasos superiores realizados. Planteamiento estructural frente a acciones horizontales en proyectos de puentes

Author(s):

Medium: journal article
Language(s): Spanish
Published in: Hormigón y acero, , n. 169, v. 39
Page(s): 117-121
Abstract:

Completed Overpass Bridges. Structural design taking into account the horizontal forces in bridges projects

In this report is shown the project criteria followed in the completion of a series of highway overpass bridges, whose particularity consists in that they are found in one of the areas in Spain having maximum seismic movement (Grade IX). The magnitude of the horizontal forces derived from the seismic movements has motivated the utilization of a calculation scheme which affords advantages in the good usage of materials and provides resources to achieve a more adequate structural design.

Available from: ACHE - Asociación Española de Ingeniería Estructural
Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10076380
  • Published on:
    22/02/2019
  • Last updated on:
    22/02/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine