0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Participant overrides can halve the reliability value of direct load control programs

Author(s):

ORCID
Medium: journal article
Language(s): English
Published in: Energy and Buildings, , v. 299
Page(s): 113606
DOI: 10.1016/j.enbuild.2023.113606
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.enbuild.2023.113606.
  • About this
    data sheet
  • Reference-ID
    10744873
  • Published on:
    28/10/2023
  • Last updated on:
    28/10/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine