0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Pareto Principle in Scoping-Phase Cost Estimating: A Multiobjective Optimization Approach for Selecting and Applying Optimal Major Work Items

This publication has been cited in the following 3 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10678050
  • Published on:
    17/06/2022
  • Last updated on:
    17/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine