0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Palomino HRT - Exploration drillings in two geological formations

Author(s):


Medium: journal article
Language(s): English, German
Published in: Geomechanics and Tunnelling, , n. 1, v. 5
Page(s): 67-71
DOI: 10.1002/geot.201200007
Abstract:

The Palomino HPP, with an installed capacity of 80 MW, is under construction in the Central Mountains of the Dominican Republic. The geological investigations for the 13.53 km long headrace tunnel were highly restricted due to difficult access in the mountain areas, high tunnel overburden as well as precautionary environmental protections in the National Park José del Carmen Ramirez. With respect to the approximately 12.4 km long TBM drive an exploration programme was carried out during excavation, to detect fractured zones as well as the presence of pressurised groundwater in advance.

Keywords:
double-shield TBM (DS-TBM) headrace tunnel segmental lining system probing in advance water ingress
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.201200007.
  • About this
    data sheet
  • Reference-ID
    10066993
  • Published on:
    05/09/2012
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine