0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Owners’ Perspective of Factors Contributing to Project Delay: Case Studies of Road and Bridge Projects in Saudi Arabia

This publication lists 28 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10669663
  • Published on:
    03/06/2022
  • Last updated on:
    03/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine