Overcoming the limitations of the green pyramid rating system in the Egyptian construction industry: a critical analysis
Author(s): |
Ahmed Osama Daoud
Ayman Ahmed Ezzat Othman Obas John Ebohon Ali Bayyati |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Architectural Engineering and Design Management, June 2021, n. 2, v. 18 |
Page(s): | 1-14 |
DOI: | 10.1080/17452007.2020.1802218 |
- About this
data sheet - Reference-ID
10429834 - Published on:
14/08/2020 - Last updated on:
27/05/2022