0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Overcoming the influence of a 2 metre long pipe offset on water flow capacity of drainage with secondary ventilation in a high-rise building

Author(s): (School of Civil Engineering, Wuhan University, China)
(School of Civil Engineering, Wuhan University, China)
(School of Civil Engineering, Wuhan University, China)
ORCID (School of Civil Engineering, Wuhan University, China)
(School of Civil Engineering, Wuhan University, China)
Medium: journal article
Language(s): English
Published in: Building Services Engineering Research and Technology, , n. 6, v. 43
Page(s): 014362442211232
DOI: 10.1177/01436244221123227
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1177/01436244221123227.
  • About this
    data sheet
  • Reference-ID
    10693341
  • Published on:
    23/09/2022
  • Last updated on:
    23/09/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine