The optimum project duration and cost curve for Hong Kong public housing projects
Author(s): |
Farzad Khosrowshahi
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management, April 1997, n. 4, v. 4 |
Page(s): | 249-269 |
DOI: | 10.1108/eb021052 |
Geographic Locations
- About this
data sheet - Reference-ID
10575557 - Published on:
27/02/2021 - Last updated on:
27/02/2021