Optimizing the Utilization of Shareable Equipment in Multiple Shifts for Construction Projects
Author(s): |
Dho Heon Jun
Choong-Hee Han Dae-Jin Kim |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Asian Architecture and Building Engineering, September 2016, n. 3, v. 15 |
Page(s): | 597-604 |
DOI: | 10.3130/jaabe.15.597 |
- About this
data sheet - Reference-ID
10330805 - Published on:
29/07/2019 - Last updated on:
29/07/2019