0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Optimizing the concession period of PPP projects for fair allocation of financial risk

This publication has been cited in the following 16 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10576876
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine