0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Optimized resource-constrained method for project schedule compression

Author(s):

Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 5, v. 29
Page(s): 2106-2129
DOI: 10.1108/ecam-12-2020-1019
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ecam-12-2020-1019.
  • About this
    data sheet
  • Reference-ID
    10610407
  • Published on:
    08/06/2021
  • Last updated on:
    16/06/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine