0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Optimized Planning Approach for Multiple Tower Cranes and Material Supply Points Using Mixed-Integer Programming

Author(s):

Medium: journal article
Language(s): English
Published in: Journal of Construction Engineering and Management, , n. 3, v. 146
Page(s): 04020007
DOI: 10.1061/(asce)co.1943-7862.0001781
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)co.1943-7862.0001781.
  • About this
    data sheet
  • Reference-ID
    10409140
  • Published on:
    10/01/2020
  • Last updated on:
    10/01/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine