Optimized Operation of an Existing Public Building Chilled Station Using TRNSYS
Author(s): |
Ming Liu
Chang Sun Baogang Zhang Julian Wang Qiuhua Duan Lin Lv |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Buildings, July 2018, n. 7, v. 8 |
Page(s): | 87 |
DOI: | 10.3390/buildings8070087 |
Copyright: | © 2018 by the authors; licensee MDPI, Basel, Switzerland. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
Download full text file (PDF)
2.95 MB
Advertisement
Advertisement
2.95 MB
- About this
data sheet - Reference-ID
10324764 - Published on:
22/07/2019 - Last updated on:
02/06/2021