0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Optimized Approach toward Identification of Influential Cost Overrun Causes in Construction Industry

This publication lists 68 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10714340
  • Published on:
    21/03/2023
  • Last updated on:
    21/03/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine