Optimization of Tunnel Boring Machine (TBM) Disc Cutter Spacing in Jointed Hard Rock Using a Distinct Element Numerical Simulation
Author(s): |
Masoud Zare Naghadehi
Reza Mikaeil |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Periodica Polytechnica Civil Engineering |
DOI: | 10.3311/ppci.9521 |
- About this
data sheet - Reference-ID
10536760 - Published on:
01/01/2021 - Last updated on:
19/02/2021