0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Optimization of preventive maintenance schedule of subway train components based on a game model from the perspective of failure risk

Author(s):
ORCID
Medium: journal article
Language(s): English
Published in: Sustainable Cities and Society, , v. 81
Page(s): 103819
DOI: 10.1016/j.scs.2022.103819
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.scs.2022.103819.
  • About this
    data sheet
  • Reference-ID
    10661981
  • Published on:
    23/03/2022
  • Last updated on:
    23/03/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine