Optimization model for the selection of materials using a LEED-based green building rating system in Colombia
Author(s): |
Daniel Castro-Lacouture
Jorge A. Sefair Laura Florez Andrés L. Medaglia |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Building and Environment, June 2009, n. 6, v. 44 |
Page(s): | 1162-1170 |
DOI: | 10.1016/j.buildenv.2008.08.009 |
- About this
data sheet - Reference-ID
10391514 - Published on:
26/11/2019 - Last updated on:
26/11/2019