矮塔混凝土斜拉桥成桥索力优化分析 (Optimization Analysis of Bridge-Completing Cable Force for Extradosed Concrete Cable-Stayed Bridges)
Author(s): |
沈翔
|
---|---|
Medium: | journal article |
Language(s): | Chinese |
Published in: | Hans Journal of Civil Engineering 的中文名称是土木工程, 2018, n. 6, v. 7 |
Page(s): | 871-877 |
DOI: | 10.12677/hjce.2018.76105 |
Structure Types
- About this
data sheet - Reference-ID
10378447 - Published on:
12/11/2019 - Last updated on:
12/11/2019