An optimal scheduling model for ready mixed concrete supply with overtime considerations
Author(s): |
Shangyao Yan
Weishen Lai |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, September 2007, n. 6, v. 16 |
Page(s): | 734-744 |
DOI: | 10.1016/j.autcon.2006.12.009 |
- About this
data sheet - Reference-ID
10188804 - Published on:
10/12/2018 - Last updated on:
10/12/2018