Optimal Life-Cycle Costing with Partial Observability
Author(s): |
Mingxiang Jiang
Ross B. Corotis J. Hugh Ellis |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Infrastructure Systems, June 2000, n. 2, v. 6 |
Page(s): | 56-66 |
DOI: | 10.1061/(asce)1076-0342(2000)6:2(56) |
- About this
data sheet - Reference-ID
10574477 - Published on:
27/02/2021 - Last updated on:
27/02/2021