0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Optimal Configuration for Batteries and Chargers in Battery Switch Station Considering Extra Waiting Time of Electric Vehicles

Author(s): (Associate Professor, State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power Univ., Beijing 102206, China (corresponding author).)
(Master Degree Candidate, School of Electrical and Electronic Engineering, North China Electric Power Univ., Beijing 102206, China.)
(Ph.D. Student, School of Electrical and Electronic Engineering, North China Electric Power Univ., Beijing 102206, China.)
(Master Degree Candidate, School of Electrical and Electronic Engineering, North China Electric Power Univ., Beijing 102206, China.)
(Engineer, State Grid Energy Conservation Service Co. Ltd., 8 Nanhengdongjie Rd., Xicheng District, Beijing 100052, China.)
Medium: journal article
Language(s): English
Published in: Journal of Energy Engineering, , n. 1, v. 143
Page(s): 04016035
DOI: 10.1061/(asce)ey.1943-7897.0000389
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)ey.1943-7897.0000389.
  • About this
    data sheet
  • Reference-ID
    10588448
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine