0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Optimal BIM staffing in construction projects using a queueing model

Author(s):



Medium: journal article
Language(s): English
Published in: Automation in Construction, , v. 113
Page(s): 103123
DOI: 10.1016/j.autcon.2020.103123
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.autcon.2020.103123.
  • About this
    data sheet
  • Reference-ID
    10414539
  • Published on:
    26/02/2020
  • Last updated on:
    26/02/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine