Oppositional NSGA-III-based optimization of multi-mode time–cost-safety risk-environmental impact for construction project
Author(s): |
Puja Bohra
Ram Swaroop Verma |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Asian Journal of Civil Engineering, February 2024, n. 4, v. 25 |
Page(s): | 3777-3790 |
DOI: | 10.1007/s42107-024-01010-2 |