0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Opening ceremony of the 8th Austrian Tunnel Day / Eröffnung des 8. Österreichischen Tunneltags

Author(s):
Medium: journal article
Language(s): English, German
Published in: Geomechanics and Tunnelling, , n. 6, v. 5
Page(s): 662-669
DOI: 10.1002/geot.201200060
Abstract:

The new Austrian tunnelling method has proved greatly successful in the past fifty years thanks to its flexibility and cost-effectiveness. The application of the NATM demands a high degree of technical and social competence from all project parties and is based on a carefully developed culture. The article summarises the requirements for the successful implementation of NATM projects, discusses some current wrong turnings and explains modern ideas in the fields of cooperative project development, tender models and value engineering.
Die Neue Österreichische Tunnelbauweise hat sich in den vergangenen fünf Jahrzehnten dank ihrer Flexibilität und Wirtschaftlichkeit in höchstem Maße bewährt. Die Anwendung der NÖT erfordert von allen Projektbeteiligten ein hohes Maß an technischer und sozialer Kompetenz und beruht auf einer sorgsam aufgebauten Kultur. Der Beitrag fasst die Voraussetzungen für die erfolgreiche Umsetzung von NÖT-Projekten zusammen, zeigt aktuelle Fehlentwicklungen auf und erläutert aktuelle Ansätze in den Bereichen kooperative Projektabwicklung, Vergabemodelle und Value Engineering.

Keywords:
NATM wrong turnings cooperation
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.201200060.
  • About this
    data sheet
  • Reference-ID
    10067520
  • Published on:
    29/03/2013
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine