0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Ontology for Relating Risk and Vulnerability to Cost Overrun in International Projects

This publication has been cited in the following 40 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10259542
  • Published on:
    29/12/2018
  • Last updated on:
    29/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine