0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

공사기간 영향요인에 따른 생산성의 OLAP 분석과 의사결정트리 분석 (OLAP and Decision Tree Analysis of Productivity Affected by Construction Duration Impact Factors)

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5345/jkic.2011.04.2.100.
  • About this
    data sheet
  • Reference-ID
    10761898
  • Published on:
    15/03/2024
  • Last updated on:
    15/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine