Off-Site Construction Three-Echelon Supply Chain Management with Stochastic Constraints: A Modelling Approach
Author(s): |
Samira Al-Sadat Salari
Hediye Mahmoudi Amir Aghsami Fariborz Jolai Soroush Jolai Maziar Yazdani |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Buildings, 18 January 2022, n. 2, v. 12 |
Page(s): | 119 |
DOI: | 10.3390/buildings12020119 |
Abstract: |
Off-site construction is becoming more popular as more companies recognise the benefits of shifting the construction process away from the construction site and into a controlled manufacturing environment. However, challenges associated with the component supply chain have not been fully addressed. As a result, this study proposes a model for three-echelon supply chain supply management in off-site construction with stochastic constraints. In this paper, multiple off-site factories produce various types of components and ship them to supplier warehouses to meet the needs of the construction sites. Each construction site is directly served by a supplier warehouse. The service level for each supplier warehouse is assumed to be different based on regional conditions. Because of the unpredictable nature of construction projects, demand at each construction site is stochastic, so each supplier warehouse should stock a certain number of components. The inventory control policy is reviewed regularly and is in (R, s, S) form. Two objectives are considered: minimising total cost while achieving the desired delivery time for construction sites due to their demands and balancing driver workloads during the routeing stage. A grasshopper optimisation algorithm (GOA) and an exact method are used to solve this NP-hard problem. The findings of this study contribute new theoretical and practical insights to a growing body of knowledge about supply chain management strategies in off-site construction and have implications for project planners and suppliers, policymakers, and managers, particularly in companies where an unplanned supply chain exacerbates project delays and overrun costs. |
Copyright: | © 2022 by the authors; licensee MDPI, Basel, Switzerland. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
3.21 MB
- About this
data sheet - Reference-ID
10657804 - Published on:
17/02/2022 - Last updated on:
01/06/2022