Off-site construction optimization: Sequencing multiple job classes with time constraints
Author(s): |
Mehrdad Arashpour
Ron Wakefield Babak Abbasi E. W. M. Lee James Minas |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, November 2016, v. 71 |
Page(s): | 262-270 |
DOI: | 10.1016/j.autcon.2016.08.001 |