0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Observations of Ground Movements during Tunnel Construction by Slurry Shield Method at the Docklands Light Railway Lewisham Extension—East London

This publication lists 16 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10538942
  • Published on:
    01/01/2021
  • Last updated on:
    19/02/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine