Numerical study on the rock muck transfer process of TBM cutterhead with clump strategy based on discrete element method
Author(s): |
Qi Geng
Huijian Zhang Xiaohui Liu Xuebin Wang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, September 2019, v. 91 |
Page(s): | 103000 |
DOI: | 10.1016/j.tust.2019.103000 |
- About this
data sheet - Reference-ID
10314953 - Published on:
24/06/2019 - Last updated on:
24/06/2019