Not In-Service Railway Arched Bridges and Their Future/ Nieużytkowane Kolejowe Mosty Sklepione I Ich Przyszłość
Author(s): |
Artur Juszczyk
(University of Zielona Gora, Institute of Building Engineering, Poland)
Marek Dankowski (University of Zielona Gora, Institute of Building Engineering, Poland) Adam Wysokowski (University of Zielona Gora, Institute of Building Engineering, Poland) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Civil and Environmental Engineering Reports, June 2015, n. 2, v. 17 |
Page(s): | 51-60 |
DOI: | 10.1515/ceer-2015-0021 |
Abstract: |
At the turn of the 19th and 20th century, on the areas of today northern and western Poland, the railway infrastructure was developing rapidly. In the late 80’s of the previous century many of the railway lines, together with the whole infrastructure including bridges, were being closed down. The example of such practices can be the brick bridge located near Nojewo, Voivodeship wielkopolskie. This article presents the technical parameters of these bridges and their damages as well as ideas for the future development of the railway facilities. |
- About this
data sheet - Reference-ID
10705333 - Published on:
19/02/2023 - Last updated on:
19/02/2023