0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Not In-Service Railway Arched Bridges and Their Future/ Nieużytkowane Kolejowe Mosty Sklepione I Ich Przyszłość

Author(s): (University of Zielona Gora, Institute of Building Engineering, Poland)
(University of Zielona Gora, Institute of Building Engineering, Poland)
(University of Zielona Gora, Institute of Building Engineering, Poland)
Medium: journal article
Language(s): English
Published in: Civil and Environmental Engineering Reports, , n. 2, v. 17
Page(s): 51-60
DOI: 10.1515/ceer-2015-0021
Abstract:

At the turn of the 19th and 20th century, on the areas of today northern and western Poland, the railway infrastructure was developing rapidly. In the late 80’s of the previous century many of the railway lines, together with the whole infrastructure including bridges, were being closed down. The example of such practices can be the brick bridge located near Nojewo, Voivodeship wielkopolskie. This article presents the technical parameters of these bridges and their damages as well as ideas for the future development of the railway facilities.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1515/ceer-2015-0021.
  • About this
    data sheet
  • Reference-ID
    10705333
  • Published on:
    19/02/2023
  • Last updated on:
    19/02/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine