0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Non-linear time-cost trade-off models of activity crashing: Application to construction scheduling and project compression with fast-tracking

This publication lists 62 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10222552
  • Published on:
    23/11/2018
  • Last updated on:
    23/11/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine