Neue Verfahren zur Ermittlung der Höhe der Allgemeinen Geschäftskosten in der Angebotskalkulation

Author(s):
Medium: journal article
Language(s): German
Published in: Bautechnik, , n. 2, v. 91
Page(s): 139-144
DOI: 10.1002/bate.201300093
Abstract:

New calculation methods for the determination of appropriate general costs in bid estimates

From the construction business management and cost theory point of view the allocation of general costs in the bid estimate to construction projects based on the bid price as distribution factor is not appropriate.
Main reasons for this statement are that it is e. g. unpredictable which construction projects will be acquired and that a shortage or excess of general costs on the company level is probable. In addition, unexpected oscillations of operating results may occur and operating results on project and company level may differ significantly. Furthermore, the actual allocation of general costs leads to the fact that large construction projects contain relatively too high amounts of general costs and small construction projects contain relatively too low amounts of general costs in the bid estimate.
The goal of this paper is to discuss the actual assumption concerning the calculation of general costs in the bid estimate and to provide alternative methods of calculating general costs. There are two new methods presented. The first method is based on relation between the manufacturing costs and the construction time of the calculated construction project versus the calculated average from the corporate planning. In the second method general costs will be allocated to a construction project in relation of the construction time of the project to the total amount of the productivity time for all construction projects of the company in the respective business year.

Keywords:
general costs bid estimate activity based costing manufacturing costs/construction time method capacity utilization method
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/bate.201300093.
  • About this
    data sheet
  • Reference-ID
    10069747
  • Published on:
    14/02/2014
  • Last updated on:
    04/10/2016
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine