Neubau der ÖBB-Brücke über die Ötztaler Ache, Österreich
Author(s): |
Helmut Mosheimer
Kurt Margreiter Daniel Cranach |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Stahlbau, May 2013, n. 5, v. 82 |
Page(s): | 347-350 |
DOI: | 10.1002/stab.201310049 |
Abstract: |
New building of the ÖBB-Bridge across the Ötztaler Ache, AustriaAfter a construction period of only eight months, the third Ötztal Valley Bridge was opened for use, relinquishing a long period of reduced-speed commerce between Innsbruck and Bludenz. The new bridge is a durable and low-maintenance steel and reinforced concrete composite construction, built under the strictest quality control and railway standards. An extensive improvement in noise control and aesthetics in such a prominent area of the Öztal Valley has been undertaken. |
Keywords: |
foundation semi-integral composite box girder bridge
|
Available from: | Refer to publisher |
Structures and Projects
- About this
data sheet - Reference-ID
10069706 - Published on:
20/01/2014 - Last updated on:
13/08/2014